You are in: "ARDS Step by Step", "CTC (Centralized Traffic Control)", "Overview" page


ARDS Step by Step. Overview


We will create very simple Layout, which will have:

  • One Signal Control
  • One Switch Control. This Switch will have Switch Lock Control, three Power Lines Controls, and Train ID Control
  • Three Track Controls. Each Track Control will have Power Line Control, and Train ID Control
  • Two Exit Pad Controls
  • Three Route Exit Controls


  • Please use menus on top of this page to find more information about ARDS.