You are in: "ARDS Step by Step", "CTC (Centralized Traffic Control)", "Overview" page
ARDS Step by Step. Overview
We will create very simple Layout, which will have:
One Signal Control
One Switch Control. This Switch will have Switch Lock Control, three Power Lines
Controls, and Train ID Control
Three Track Controls. Each Track Control will have Power Line Control, and
Train ID Control
Two Exit Pad Controls
Three Route Exit Controls
Please use menus on top of this page to find more information about ARDS.