You are in: "Home", "Objectives" page

Our Objectives


We spent lots of time to create ARDS software. It was created from scratch, we did not use any already existing codes.
So far ARDS has a lots features, such us creating RTUs, Variables in RTUs, Boolean Equations for Variables, Protocols settings, creating and managing Equipment, creating Users Categories and Users Information, allowing Users to access application GUI elements based on his/her priviledges, multilanguage support, and much more.

Using our own controls (Timers, Tracks, Switches, Power Lines, Signals, Digital Indicators, Crossing Gates, Exit Pads, Labels, Buttons, Lines, Route Exits) we can create Layouts. We can execute Layouts in Simulation mode. So far we can simulate GPS Positioning (NVIDIA protocol), and code protocols.
Dark Territory part is fully done, and can be implement in real project right away.

We prepared few Demos to show what ARDS can do right now. These Demos includes:

  • Crossing Gates indication
  • Main and Siding Trains moving
  • Move Trains with Routes lineup
  • Move Trains without Routes lineup (useful for Yards)
  • Demo for CTC Automatic Schedule Trains moving
  • Demo for tracking Trains by GPS position
  • Demo for Dark Territory

  • We reached point when ARDS needs to be implemented in real project.

    Because of this, we are looking for cooperation with company or person for implementing it in real project. It can be CTC, GPS, Yard, or Dark Territory project.

    Or, we wish to sell ARDS as "it is".

    Please contact us if you have any questions or proposals.


    Please use menus on top of this page to find more information about ARDS.