You are in: "ARDS Step by Step", "CTC (Centralized Traffic Control)", "Test in "Simulation" mode" page


ARDS Step by Step. Test in "Simulation" mode


So far we did:

  • Created Layout
  • Created Subdivision in Layout
  • Created RTU in Layout
  • Add Controls to Layout
  • Created Variables which will be used by Controls Conditions
  • Attach Variables to Controls Conditions
  • Set Controls connections
  • Created two Signalling Routes

  • Next video is show how to lineup Signalling Route, and how to proceed Route.
    We will lineup Route from "CD_5_SIG_010" Signal to "CD_5_EP_010" Exit Pad.


    Next video is show how to lineup Signalling Route, and how to proceed Route.
    We will lineup Route from "CD_5_SIG_010" Signal to "CD_5_EP_020" Exit Pad.


    Next video is show how to cancel Signalling Route. Route can be canceled if no Proceed in this Route yet,
    i.e. no one Control in this Route is in "Occupied" Condition.


    Next video is show how to work with Power Lines in "Simulation" mode.


    Next video is show how we can block/unblock Controls in "Simulation" mode.


    Next video is show how we can add/remove WAM (Warning Access message) for Tracks and Switches Controls in "Simulation" mode.


    Next video is show consistency of the "Simulator".



    Please use menus on top of this page to find more information about ARDS.